Skip to main content

Know which lane you are in

60-second outcome guide. Sound is optional; captions and the text path contain the same instruction.
The recording is being refreshed from its acceptance test. The verified text steps below remain available now.

Read it instead

Know which lane you are in

Lab, Certification, and Production are separate lanes with separate credentials, and the lane switcher always shows where you are. Open Lab and press Run Lab test on the shipped defaults: typed JSON, raw X12 850, then raw EDIFACT orders. A pass shows success checks with partner contacted false and a simulated acknowledgement, because Lab never reaches a partner endpoint. Certification is the first lane that contacts the partner, with real acknowledgements on the exact connection. Production stays gated until testing, approval, and the go-live gate are met. Next, validate one full document in Lab, then certify the exact route with the partner.

What to notice

  1. Separate credentials for each
  2. Run Lab test on JSON, X12, EDIFACT
  3. Production stays gated until approval

Next, validate one full document in Lab, then certify the exact route with the partner.

© 2026 SignalEDI Inc. All rights reserved.